top of page
All Posts


Getting an 88 kVA Cat Down Tower Bridge Road — Basement Tunnels, Air, Heat, Exhaust and a Premier Inn
Tower Bridge Road is not a trading estate. It is central London: tight basements, neighbours who do not want a generator, and a life safety set that still has to start when the mains fails. The job was a Caterpillar 88 kVA standby generator — a Cat DE88-class C4.4 set — for life safety on a new development. Sprinklers, smoke control, lifts: the loads that have to run, not the loads that would be nice. The questions on day one were not “what colour is the canopy?” They were: W
Generator man
Sep 214 min read


Built in Britain. Powered by Perkins. Ready when the grid isn’t.
If the lights go out, you do not want a generator that was bolted together on the other side of the world, sat on a dock for six weeks, and then sold with a smile and a vague warranty. You want a set that was built here, with a British Perkins engine at the heart of it, a sensible lead time, and a team in Chesterfield who will still pick up the phone in five years’ time. That is what we do. Who we are GES Power Ltd is a family-run business based at Cavendish Business Park in
Generator man
Sep 185 min read


Hush next to the Dominion: a quiet roof set, and how you actually load-bank it
An office block near the Dominion Theatre does not get a second chance on noise. When the West End is full and the mains goes down, the last thing the building needs is a generator that sounds like a wagon parked on the roof. The brief was standby power with hush — a set that would start, take the load, and stay whisper-quiet. The machine as supplied was not that quiet. The answer was not a polite acoustic enclosure from a catalogue. We designed and built a drop-over canopy a
Generator man
Sep 113 min read


First, the structure — not the generator
You do not land several tonnes of plant on a historic roof and hope the joists agree. A structural engineer was brought in to calculate the loads: the wet weight of the set, the frame, fuel in the belly tank, access steel, wind, and point loads through the existing structure. Only when those numbers were sound did we design and build a frame from I-beams to take the generator. The set sits on that frame, not on the roof covering. Going the extra mile on a job like this is not
Generator man
Sep 113 min read


When the job is on a Thames Water roof next to the Greenwich ferry
We were not asked to quote a standard generator package. We were asked to take old chimneys off the roof of a Thames Water waste treatment plant next to the Greenwich ferry, design the replacements, get the scheme approved, crane two new stacks into position, and make the roof good again. That invitation only arrived because of the chimney systems we already design, specify and install for our own generator work. On a live Thames Water site you do not get a second chance to l
Generator man
Sep 114 min read


When the Plant Room Is Built First: Installing a 330 kVA Standby Generator in Plaistow
On paper it was straightforward. A 330 kVA standby generator for a building in Plaistow, East London. Concrete structure already up. Dedicated generator room already formed. An opening into that room of 2.5 m wide by 2.5 m high. Simple, you would think. It was not. The generator room was not at ground level. Worse, the only opening into it sat 2,700 mm above the finished floor. There was no loading dock, no slab-level doorway, and no crane path that could drop a complete set
Generator man
Sep 113 min read
bottom of page

